https://web-cms.inka.co.id/uploads/large_Ekterior_Light_Rail_Transit_LRT_PT_INKA_Persero_655bb66590.jpg
https://web-cms.inka.co.id/uploads/large_Interior_Light_Rail_Transit_LRT_PT_INKA_Persero_da7dda1096.jpg
https://web-cms.inka.co.id/uploads/large_Interior_Light_Rail_Transit_LRT_PT_INKA_Persero_1_3c67b99b2e.jpg
Propelled Car

Light Rail Transit (LRT) SumSel

The South Sumatra Light Rail Transit (LRT) operates in Palembang, South Sumatra, connecting the city center with Sultan Mahmud Badaruddin II Airport. The South Sumatra LRT is designed to meet the needs of efficient and modern urban transportation. Each trainset has a spacious seating capacity that is accessible for persons with disabilities and is equipped with a modern control system for passenger safety and comfort.

The South Sumatra Light Rail Transit (LRT) features a configuration of Mc1 - T - Mc2. It is designed for a maximum speed of 100 km/h, with an operational speed of 85 km/h. The gauge width is 1,067 mm, and the maximum axle load is 12 tons. Each train unit has a length of 18,000 mm, a width of 2,650 mm, and a height of 3,850 mm from the rail.

General Specification

Configuration
Mc1 - T - Mc2
Maximum Speed Design
100 km / hour
Operational Maximum Speed
85 km / hour
Track Gauge
1.067 mm
Maximum Axle Load
12 ton
Total Length (each car)
18.000 mm
Total Width
2.650 mm
Total Height
3.850 mm
Floor Height
1.000 mm

Seat Capacity

Mc Configuration
40 seats
T Configuration
48 seats

Kapasitas Penumpang Berdiri

Konfigurasi Mc
81 penumpang
Konfigurasi T
89 penumpang
scroll